Dynamic logoTHE DYNAMIC
GROUP

Services · Concrete

Concrete foundations, slabs and paving

We form, pour and finish concrete foundations, house and shed slabs, driveways and paving across residential and commercial sites. One crew handles formwork, steel, pour and finish, so the slab you get matches the engineer's drawings and the finish you chose.

Based in Keilor East, Melbourne. Working across metropolitan and regional Victoria, New South Wales and South Australia.

Concrete foundations, slabs and paving by The DYNAMIC Group

Our work

Concrete foundations, slabs and paving

What it includes

  • Strip and raft footings to engineer's design
  • House, garage and shed slabs
  • Driveways, paths and patios
  • Formwork, steel fixing and vapour barrier
  • Broom, trowel or specified finishes
  • Saw-cut control joints and sealing

Good for

  • New homes and extensions
  • Sheds, workshops and farm buildings
  • Commercial slabs and hardstands
  • Retirement villages and holiday parks

How it runs

  1. Site visit to check access, levels and ground conditions
  2. Written scope: thickness, steel, finish, joints and drainage
  3. Excavation and preparation by our own crew
  4. Pour, finish and cure, then joints cut and sealed
  5. Handover with care notes for the first weeks

Questions we get asked

How thick should a driveway slab be?

We pour driveways at a minimum of 125 mm, up to 150 mm where caravans, boats, trucks or other heavy vehicles will use them, and pathways at 100 mm, all with steel reinforcement. Your engineer or our site visit confirms the right spec for your soil and loads.

How long before I can use the slab?

Foot traffic is usually fine after a day or two. Cars should stay off a driveway for about seven days, and concrete reaches its design strength at 28 days. We give exact timing at handover.

Do you do the excavation as well?

Yes. The same crew does the site cut, preparation, piers if needed, and the concrete, which is faster and avoids handover problems between trades.